Footpath and dropped kerb needed

Please sign in to vote.

Added by Stephan Matthiesen

Need dropped kerb and a few metres of footpath to connect the existing footpath, so that people can cross at the existing traffic island to get to the road leading to the recycling centre.

This is a very important pedestrian and cycle connection between the Inch and Craigmillar Castle Park. You can see from the desire line that many people walk across there already.

The high kerb makes it impossible to use for people with bicycles, wheelchairs, buggies etc. They are forced to travel along the busy Old Dalkeith Road rather than cross it directly.

Location

Issues nearby
Back to top